
Semi-automated Tyre Recycling Plant for Sale comma Tyre Recycle EPT
hydraulic program comma simple operation and secure interval
Mechanical description colon the tires a lot more than 800 require to minimize comma and cut into 4 parts in EPT periodthe dimensions of piece is 200-500mm period
Notes for utilizing tire cutter colon
a period Inspect the knives often comma if appear apparent blunt comma it must be maintain timely comma and the service is two-3 several years interval
b time period the oil in hydraulic station need to be filtered and transformed regularly time period EPTly filter once every a single and 50 percent 12 months interval
c time period Putting on components colon rubber seals comma shipped with another set when ship the EPT to the consumer period of time
three amp4 time period EPT tire shredEPTZPS-900
Use colon
This EPT can straight crush tires more compact than 800mm tires time period At the EPT temperature comma can be put right crushed into 50 ast 50 mm block comma so the up coming rotating can grind into ten-30 meshes or wire and fiber separation gear interval
Function colon
This EPT is a compact framework comma advanced technological innovation comma low vitality consumption comma higher effectiveness comma smashing off the test space for the construction comma routine maintenance is especially handy semi resources with carbide surfacing engineering comma substantial hardness comma higher put on resistance comma and recurring mend using comma so has a EPTer services daily life semi rotary monitor for the lattice framework of steel mesh comma blanking massive region comma enabling the screening of competent rubber interval Soon after the partition of large tires can accomplish the impact of the same excl
Mechanical description colon the tires of 800mm diameter and rubber ring can directly be broken into 50 ast50 mm of rubber block period
Notes for making use of EPT tire shredder colon
a time period Inject gear oil into EPT oil lparhypoid gear oil rpar comma principal bearings use calcium-dependent grease lubrication comma a few months following the procedure of the EPT comma the oil need to be changed and clean the gasoline tank time period Considering that then alter the oil when time every single calendar year time period
b Soon after deal with three comma000 tons of waste rubber lparin regular conditions rpar commathe consumer must grind the blade reducing edge when time period of time The blades is the put on components comma the EPT provider daily life is five-6 years comma when offering the EPT to the customer comma the shredEPTwill be geared up with edge hardness layer patching materials lparelectrodes rpar time period
5 interval Double Rolls Rubber Crusher XKP-560
Use colon
Primarily utilized for crack large rubber blocks into 40-50mm little rubber blocks interval
Technical parameters colon
Construction colon The rollers adopt alloy chilly hard forged irons with use-resisting comma sturdy characters period of time The mill flour is with teeth comma high groove interval
In orEPTto extend the provider existence of the cracker comma we suggest create foundations for rubber cracker interval
The configurations of our XKP-560 rubber cracker are nylon bush grease lubrication and hard gear surface EPT with reduced sound and EPTer service existence time period
5Our crackers are developed XiHu (West Lake) Dis.Hu (West Lake) Dis.nized with great working platforms comma all the wires will be linked properly from managing program to motor period of time When making use of the EPT comma the customers just need to have to connect directly to the EPT interval
squander tyre recycling products comma Squander tire recycling EPT
| No time period | Name | Design | Qty period of time lparQty rpar |
Motor EPT lparKW rpar | ||
| 1 | One hook debeader | LSJ-1200 | 1 | eleven | ||
| two | EPT tyre cutter | QDJ-1200 | one | 5 period5 | ||
| 3 amp4 | EPT tyre shredder lparwith conveyor rpar |
ZPS-900 | 1 | 61 period5 | ||
| 5 | Double Rolls Rubber Crusher | XKP560 | one | ninety | ||
| six | Huge conveyor tools | BCL-eight | 1 | two | ||
| seven | Modest conveyor tools | BCL-3 | one | 1 period1 | ||
| eight | Massive Magnet separator | BMS22 | 1 | two period2 | ||
| 9 | Tiny Magnet separator | SMS-1 | one | one period1 | ||
| ten | Large Shaking monitor | BSS-8 | one | seven period5 | ||
| eleven | Little Shaking display | SSS-3 | 1 | 3 | ||
| twelve | Fiber separator | FS110 | one | five period5 | ||
| 13 | Wonderful Rubber Powder Pulverizing EPT | XJFS-420 | 4 | 123 | ||
| Square vibrating sieve | 600 | one | ||||
| Rubber powder collector | JFS500 | 1 | seven period5 plus0 period75 equals8 period25 | |||
| Screw conveyer | Phi200mm | 1 | period75 | |||
| Screw conveyer | Phi132mm | 1 | period75 | |||
| Storage pin | 1 period5cbm | 1 | ||||
| Hopper | 1 | |||||
| Belt conveyer | one | period75 | ||||
| 14 | Metal Baller EPT | 30T | 1 | 7 period5 | ||
| 15 | Rubber powder EPT EPT | one | 3 | |||
| 24 | 334 period4KW | |||||
| No | Name | design | amount | EPT | ||
| EPT tire pre-processing comma you will get lt 50 ast50MM rubber crumb | ||||||
| one | Ring cutter | QQJ-1200 | one | five period5KW | ||
| 2 | Loop EPT | YQJ-295 | one | 15KW | ||
| three | Strip cutter | QTJ-370 | 1 | five period5 KW | ||
| four | Block cutter | QKJ-two hundred | 1 | 11 KW | ||
| Rubber powder processing colon you will get twenty-30 mesh rubber powder commaat the same time comma individual the fiber and steel wire | ||||||
| five | Tyre crusher | XKP400 | one | forty five KW | ||
| XKP450 | 55 KW | |||||
| XKP560 | seventy five KW | |||||
| six | Large conveyor equipment | BCL-eight | 1 | 2 KW | period of time | |
| 7 | Modest conveyor products | BCL-three | 1 | one period1 KW | ||
| 8 | Massive Magnet separator | BMS22 | one | two period2 KW | ||
| nine | Little Magnet separator | SMS-1 | one | 1 period1 KW | ||
| ten | Massive Shaking display | BSS-eight | 1 | seven period5 KW | ||
| eleven | Small Shaking display | SSS-three | period of time | one | 3 KW | |
| twelve | Fiber Separator | FS110 | 1 | eleven KW | ||

