Thickness: | 2.0mm, three. 0mm, four.0mm |
width: | 1m |
Size | 10m |
The technical specs can be EPT by the buyers’ requirments. |
Solution Specification | |||||||
Brand quot STAR Power quot SBS fleXiHu (West Lake) Dis.ble modified asphalt water-resistant membrane use SBS (styrene-butadiene-styrene) thermoplastic elastomer modified asphalt as dip-coating material, , with substantial-top quality polyester felt, glass fiber felt, glass fiber strengthened polyester felt as foundation substance, using fine sand, mineral pellets, PE movie, aluminum movie, etc as launch liner, the SBS fleXiHu (West Lake) Dis.ble modified asphalt water-resistant membrane agitated and floor by EPT EPT. |
|||||||
Attributes one) Secure, easy and quickly installation, no naked flame, no binder, no air pollution. 2) Exceptional adhesive overall performance, self-healed property. 3) Anti-puncture, anti-stress, good eEPTation, anti-corrosion. 4) Excellent fleXiHu (West Lake) Dis.bility unEPTlow temperature. 5) Widened membranes can minimize loss. |
|||||||
Application one) EPT and civil constructing roofing, underground, pool, tunnel, picket and metal roofing. two) EEPTly in the chemical manufacturing unit, XiHu (West Lake) Dis.Hu (West Lake) Dis.ment manufacturing unit, and granary. 3) EPTpe can be used for sealing all design materials four) Watertight remedy of structural construction joints, overlap sealing of polymer waterproof membrane. |
Storage and Transportation 1) Separate storage for various models. two) Temperature need to be below forty ordmC. three) Avoid immediate sunshine, rain, hold ventilated. four) Do not piled horizontally, hold stand vertically and not much more than two flooring. |
|||||||
Construction Method: Step1: Ensure all surface area are clean,dry and dust-cost-free. Eliminate any free particles and any rust with a wire brush amp soft broom. Step2: Roll out the membrane. Step3: Peel back about 6 quot-twelve quot of the launch liner and area the adhesive side to the beforehand ready area. Step4: Keep on to peel again the rlease liner as the rape is unrolled and press EPT into location over the base seam. Step5: Apply company, uniform force with a hand roller to the complete surface area of the EPT, eEPTly at the overlaps. Step6: Clean flat all edages with a wallpaper roller or trowel. Step7: After use reseal pack and shop uprigEPT in amazing,dry issue. |
Specification for EPT Bituminous Water-proof Membrane: | |||||||
No. | Objects | PE | PET | PYG | |||
PY | G | PY | G | ||||
one | Solubale Compound, g/m sup2 ge | 3mm | 2100 | – | |||
4mm | 2900 | – | |||||
5mm | 3500 | ||||||
2 | EPTermeability | Force, Mpa ge | .3 | .2 | .3 | ||
Preserve time, min ge | thirty | ||||||
3 | Heat Resistance | ninety ordmC | one hundred and five ordmC | ||||
No flowing or dripping | |||||||
four | Nai Tear Resistance (N/50mm) ge | five hundred | 350 | 800 | 500 | 900 | |
5 | EEPTation Max. Rigidity,% ge | 30 | – | forty | – | – | |
six | Minimal Temperature FleXiHu (West Lake) Dis.bility , ordmC | -20 | -twenty ordmC | ||||
No cracks | |||||||
10 | Warmth Getting older | Rigidity Retention, ge | 80% | ||||
Reduced Temperation FleXiHu (West Lake) Dis.bility | -fifteen ordmC | -20 ordmC | |||||
Visual appeal | No slipping, flowing or dripping | ||||||
11 | Government StXiHu (West Lake) Dis.Hu (West Lake) Dis.rd | GB18242-2008 |
Construction Method:
Step1: Make certain all surface area are thoroughly clean,dry and dust-totally free. Get rid of any free particles and any rust with a wire brush amp comfortable broom.
Step2: Roll out the membrane.
Step3: Get rid of the backing paper and place the adhesive aspect to the beforehand geared up surface.
Step4: To ensure a tigEPT make contact with-easy the EPT down with a dry cloth, remocing all the air bubbles
Step5: Press the EPT to the surface firmly when in place.
Step6: Smooth flat all edages with a wallpaper roller or trowel.
Step7: Soon after use reseal pack and keep uprigEPT in cool,dry situation.
Storage and Transportation:
one) Deal in plastic bag.
2) Different storage for various versions.
3) Keep away from direct sunshine, rain, preserve ventilated.
four) Do not piled far more than 5 floors with each other if horizontal, one ground if stand.